
Helping create signature hotels worldwide
The daring and innovative architecture of Atlantis The Royal hotel is instantly an iconic addition to the skyline of Dubai. Set on the crescent of The Palm, each and every detail in the exterior and interior of the hotel is designed to challenge the boundaries of imagination.
As a leading Water-Tech company ACO was nominated to support the project during the stage of planning and specification, working closely with the team of architects to select the solutions that comply with the high standards of aesthetics and functionality.
ACO was the preferred supplier for water management solutions inside the building and also bespoke slot drainage for the terraces, especially designed according to the project design specifics, landscaping solutions, professional drainage and grease management solution for the professional kitchens.
Information at a glance
Which products were used/ installed?
Line drainage
o 13 000 m Stainless steel slot drainage for balconies
o 2 200 m Slot Drainage for landscaping areas and decks
o Point drainage gulliesStainless steel drainage
o Box channels and gullies for the Aquarium area and inside kitchensWater treatment for oils and light liquids
Grease management system
Who took care of the project?
- ACO Systems FZE
Which ACO department provided technical service?
- ACO Systems FZE