Efficient drainage concept for open spaces.
Remodeling Holstenbrücke – Kleiner Kiel Canal
With this new area, Kiel has gained an attractive city-centre space that welcomes visitors to stay. Based on the development goals, such as the creation of public space in which to stroll and while away the hours, the enhancement of the city image and the improvement of the retail location, plans were also drawn up to develop a new water route between Kleiner Kiel and Bootshafen (Boat harbour). The Kleiner Kiel Canal that was created as a result has been a major contributor to the attractiveness of the area.
Where previously there was a multi-lane road that left hardly any space for pedestrians, large areas have been repurposed as a recreation and relaxation space. This space includes two ponds that reflect the maritime flair of the city. Furthermore, the promenade allows the restaurants and cafes in this area to offer outside seating along the Fleet. The previous traffic areas for trams, buses, cyclists and pedestrians have been restructured to create a large square area in which private car traffic cannot enter.
Information at a glance
Which products were used/ installed?
- ACO DRAIN® Multiline Sealin V 100 S, with a slotted trench
- ACO DRAIN® Multiline Seal in V 100 S, with slotted grating
- ACO road drain with 300 x 500 edge rails
- ACO Wotan protective tree grates
- Special shaft covers
- V2A slotted trenches
Which ACO department took care of the project?
- ACO Tiefbau Vertrieb GmbH
- ACO Passavant Detego GmbH
- Inotec Sportanlagen & Edelstahltechnik
Which ACO department provided technical service?
- ACO Tiefbau Vertrieb GmbH
- ACO Passavant Detego GmbH
- Inotec Sportanlagen & Edelstahltechnik
Which companies/ firms where involved?
- Planner: Urban development – yellow Z urbanism architecture, Berlin
Structural engineering and water technology – Ingenieurbüro Obermeyer, Potsdam
Traffic infrastructure – Masuch + Olbrisch, Oststeinbek
Support structure planning – IFB Frohloff Staffa Kühl Ecker, Berlin
Bridges in collaboration with Sauerzapfe Architekten, Berlin - Contractor/ Installer: ARGE SAW Kiel GmbH & Co. KG and Erwin Rumpf GmbH & Co. KG, Schleswig
- Customer/ Investor: The state capital of Kiel
When was the object build? How long was the construction period?
- 2020; four years